Gulf Building completed the Town of Davie Water/ Waste Water Treatment Plant for AECOM USA. Gulf assisted the design-build team in constructing a 6-million-gallon-per-day (MGD) brackish water membrane treatment plant as well as a 3.5-MGD membrane water reclamation facility. The project also included a new utility office for the town, a series of five raw water wells, two deep injection wells and reuse of the reclaimed water. Gulf’s scope of work consisted of the Structures Package, comprising 14 buildings, including foundations, concrete, masonry, tilt-wall systems, roofing, windows and doors, structural steel, miscellaneous metals, stucco & EIFS and elevator systems.