Project Details

Owner SFRTA
Location Pompano Beach, FL
Project Cost $40 Million
Project Size 75,000 SF / 4 Story Operation Center Building
23,000 SF Train Station
4 Level Parking Garage (475 Spaces)
Certified LEED Gold
ABC Excellence in Construction Award, Commercial Category (Eagle Award)
GalaVerde LEEDership and Green Award, Most Outstanding Green Transit

Project Description

Design-build contract for new construction of a 4-story, 474-space parking garage and a 3-story, 75,000 square foot operation center that included approximately 70,000 square feet of offices, a 3,200 square foot customer service and dispatch center, and a 150-seat board chambers. The project included CCTV, card access and fire alarm systems.

The Tri-Rail Pompano Beach Station Improvements portion of the Project included the demolition of the existing platform and the construction of a new 23,000 SF state-of-the-art station.  The new station included solar power, LED lighting, new bicycle lockers, dedicated alternative fuel-source parking, electric vehicle charging stations, and a crossover bridge. The existing station remained in operation throughout construction. The Project was certified LEED Gold by the USGBC.