Project Details

Owner Palm Beach County Department of Airports
Location West Palm Beach, FL
Project Cost $64 Million
Project Size 7 Level / 1,421,000 SF (3,500 Spaces)

Project Description

7-story, 3,500 space, 1,421,000 SF precast concrete parking structure that included all related site improvements and construction of vehicular bridges to tie it into an adjacent parking structure and the existing airport terminal. To facilitate use of the pedestrian bridges, two elevators as well as five stair towers were constructed.