Project Details

Owner Miami-Dade Transit
Location Miami, Florida
Project Cost Total Project Value: $19 Million
Gulf Subcontract Value: $3.5 Million
Project Size 30,000 SF (All Floors)
10,000 SF (Control Center)

Project Description

Gulf was part of the winning team for the Design-Build of the Miami Metrorail Control Center Upgrades Project for MDT. The scope of work involved the complete modernization of MDT’s existing Metrorail Control Center (MRCC), to provide improved operations and maintenance of Metrorail facilities and systems, and to improve response times to critical safety and security events. The MRCC is located on the fifth-floor of the Stephen P. Clark Government Center building in downtown Miami. This project included the development of existing office space to accommodate the modernization of the existing Central Control facility and systems, including the heating, ventilation and air conditioning (HVAC) system on the 3rd, 4th, and 5th floors, power distribution units, multiple server units/ banks, uninterruptible power supplies, electrical systems, and existing systems hardware and software. All work was done while the Stephen P. Clark Government Center and the existing Central Control Center remained fully operational 24/7.